Engineering Challenge
The site combined large shell-roof areas with adjacent ground space, requiring a mounting approach suited to both roof loading and open-ground conditions at 6 MW scale.


Flying Paper and Board Mills
Low voltage termination at 400V distributed across multiple termination points. Localised termination at 800V stepped up via transformer to 11kV, distributed throughout the facility.
Hot-dip galvanised (HDG) steel structure, mounted on shell roof and ground-mounted areas.
The site combined large shell-roof areas with adjacent ground space, requiring a mounting approach suited to both roof loading and open-ground conditions at 6 MW scale.
NEEP engineered a hot-dip galvanised steel mounting system deployed across both shell roof and ground-mounted sections, supported by a multi-point low-voltage termination design with a stepped-up 11kV distribution network across the facility.


2 photos

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.