NEEP Energy
6 MW Solar Project
Back to All Projects
Flying Paper and Board Mills

6 MW Solar Project

Flying Paper and Board Mills

PV Capacity
6 MW
Sector
Paper
Business Type
Industrial

Electrical Termination

Low voltage termination at 400V distributed across multiple termination points. Localised termination at 800V stepped up via transformer to 11kV, distributed throughout the facility.

Mounting Structure

Hot-dip galvanised (HDG) steel structure, mounted on shell roof and ground-mounted areas.

Engineering Challenge

The site combined large shell-roof areas with adjacent ground space, requiring a mounting approach suited to both roof loading and open-ground conditions at 6 MW scale.

Engineering Approach

NEEP engineered a hot-dip galvanised steel mounting system deployed across both shell roof and ground-mounted sections, supported by a multi-point low-voltage termination design with a stepped-up 11kV distribution network across the facility.

Scope of Work

  • Turnkey project development including PV & Engineering Design
  • Supply & installation of solar mounting structures
  • Complete PV & electrical installation, testing & commissioning
  • Grid interconnection and system optimisation

Partners

Partner
Partner

Project Gallery

2 photos

Solar EPC project background

Ready to Move from Design to Power-On?

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.