Engineering Challenge
The site combined shell-roof and ground areas, each needing a mounting approach suited to its own structural conditions.


Bhatti Paper Mills
Low voltage termination at 400V distributed across multiple termination points.
Hot-dip galvanised structure, ground-mounted; P3 hot-dip galvanised structure, mounted on shell roof.
The site combined shell-roof and ground areas, each needing a mounting approach suited to its own structural conditions.
NEEP applied a hot-dip galvanised ground-mounted structure alongside a P3 hot-dip galvanised shell-roof structure, delivering a single system across both areas.


3 photos

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.