Engineering Challenge
The site presented two distinct mounting environments: extensive PEB roof areas and adjoining ground areas, each requiring a different structural approach.


Atlas Honda (Atlas Group)
Low voltage termination at 400V distributed across multiple termination points. Localised termination at 800V stepped up via transformer to 11kV, distributed throughout the facility.
Anodised aluminium structure mounted on pre-engineered building (PEB) shed roofing; hot-dip galvanised structure on ground-mounted areas.
The site presented two distinct mounting environments: extensive PEB roof areas and adjoining ground areas, each requiring a different structural approach.
NEEP engineered the 2.46 MW roof-mounted portion using anodised aluminium rail structures suited to PEB roofing, and the 2.47 MW ground-mounted portion using driven-pile, hot-dip galvanised steel structures, delivered under one integrated engineering and EPC scope.


3 photos

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.