Engineering Challenge
A textile manufacturing facility required a ground-mounted system capable of handling 4 MW capacity with a dependable, long-term outdoor structural solution.


Nisar Spinning Mills (NSM)
Low voltage termination at 400V distributed across multiple termination points. Localised termination at 800V stepped up via transformer to 11kV, distributed throughout the facility.
Hot-dip galvanised (HDG) steel structure, ground-mounted.
A textile manufacturing facility required a ground-mounted system capable of handling 4 MW capacity with a dependable, long-term outdoor structural solution.
NEEP specified a hot-dip galvanised ground-mounted structure for durability, supported by a distributed low-voltage termination network with localised step-up to 11kV for facility-wide distribution.


4 photos

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.