Engineering Challenge
The available installation area was a landscaped green belt rather than a conventional roof or open yard, requiring a raised ground-mount approach that preserved the site’s landscaping.


Omya Pack (Packages Group)
Low voltage termination at 400V distributed across multiple termination points.
P1 raised ground-mount structure on green belt area.
The available installation area was a landscaped green belt rather than a conventional roof or open yard, requiring a raised ground-mount approach that preserved the site’s landscaping.
NEEP installed a raised P1 ground-mount structure on the green belt, combined with a customised hot-dip galvanised structure built to international safety provisions, plus a dedicated inverter shed.


3 photos