Engineering Challenge
The roof area required a mounting method that would avoid penetrating the existing roofing structure of this food-sector facility.

Zahid General Mills
Low voltage termination at 400V distributed across multiple termination points.
P1 anodised aluminium structure mounted on ballast.
The roof area required a mounting method that would avoid penetrating the existing roofing structure of this food-sector facility.
NEEP specified a ballasted P1 anodised aluminium structure, securing the system without roof penetration.


2 photos