NEEP Energy
2 MW Solar Project
Back to All Projects
Thermal Power Plant

2 MW Solar Project

Thermal Power Plant

PV Capacity
2 MW
Sector
Power Generation
Business Type
Industrial

Electrical Termination

Low voltage termination at 400V distributed across multiple termination points. Localised termination at 800V stepped up via transformer to 11kV, distributed throughout the facility.

Mounting Structure

Direct-pile hot-dip galvanised (HDG) structure, ground-mounted.

Engineering Challenge

A power generation facility required a ground-mounted system engineered for long-term structural reliability within an active industrial site.

Engineering Approach

NEEP installed a direct-pile hot-dip galvanised structure for durable ground-mount performance, integrated with a distributed low-voltage termination network and local step-up to 11kV.

Scope of Work

  • Complete project development including pre- sales activities
  • PV & Engineering Design facilitation
  • Supply & installation of HDG structure
  • Electrical installation, testing & commissioning

Partners

Partner
Partner

Project Gallery

2 photos

Solar EPC project background

Ready to Move from Design to Power-On?

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.