Engineering Challenge
The roof area required a mounting solution that would not penetrate the existing roofing membrane.


Royal Polytex
Low voltage termination at 400V distributed across multiple termination points.
P1 anodised aluminium structure mounted on ballast.
The roof area required a mounting solution that would not penetrate the existing roofing membrane.
NEEP specified a ballasted P1 anodised aluminium structure, securing the array without roof penetration while meeting wind and structural load requirements.


3 photos

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.