Engineering Challenge
The ground-mounted array required a foundation system suited to long-term structural loading, along with new power room infrastructure to support the system.


Al-Noor MDF
Low voltage termination at 400V distributed across multiple termination points. Localised termination at 400V stepped up via transformer to 11kV, distributed throughout the facility.
Concrete pile-based anodised aluminium structure, ground-mounted.
The ground-mounted array required a foundation system suited to long-term structural loading, along with new power room infrastructure to support the system.
NEEP engineered a concrete pile-based aluminium mounting structure for ground-mount stability, delivered alongside new power room construction and a post-commissioning O&M period.


2 photos

Let our team take full responsibility from engineering and execution to commissioning, O&M readiness, and asset performance optimization.